Deficiency Records for Pine View Transitional Rehab
Updated as of April 01, 2022
This is not the most recent data for Pine View Transitional Rehab. For the most recent information, click here.
A list of the most recent deficiencies for Pine View Transitional Rehab. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.
Deficiency | Type of Deficiency | Deficiency Date | Date Corrected | Resulted from a Complaint? |
---|---|---|---|---|
Keep aisles, corridors, and exits free of obstruction in case of emergency. | Fire Safety | 2021-12-14 | 2022-01-07 | N |
Have properly installed electrical wiring and gas equipment. | Fire Safety | 2021-12-14 | 2022-01-07 | N |
Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Fire Safety | 2021-12-14 | 2022-01-07 | N |
Have proper medical gas storage and administration areas. | Fire Safety | 2021-12-14 | 2022-01-07 | N |
Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Health | 2021-12-16 | 2022-01-03 | N |
Provide and implement an infection prevention and control program. | Health | 2021-07-07 | 2021-07-21 | Y |
Perform COVID19 testing on residents and staff. | Health | 2021-07-07 | 2021-07-21 | Y |
Install corridor and hallway doors that block smoke. | Fire Safety | 2019-10-21 | 2019-10-28 | N |
Have proper medical gas storage and administration areas. | Fire Safety | 2019-10-21 | 2019-10-28 | N |
Have generator or other power source capable of supplying service within 10 seconds. | Fire Safety | 2018-10-16 | 2018-11-01 | N |
Have simulated fire drills held at unexpected times. | Fire Safety | 2018-10-16 | 2018-10-30 | N |
Ensure gas and vacuum systems are inspected and tested as part of a maintenance program. | Fire Safety | 2018-10-16 | 2018-10-30 | N |