Deficiency Records for Quality Life Services - Henry Clay

(Home page)

Updated as of April 01, 2024

A list of the most recent deficiencies for Quality Life Services - Henry Clay. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.

Deficiency Type of Deficiency Deficiency Date Date Corrected Resulted from a Complaint?
Ensure residents have reasonable access to and privacy in their use of communication methods. Health 2023-08-31 2023-10-20 N
Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. Health 2023-08-31 2023-10-20 N
Implement emergency and standby power systems. Fire Safety 2023-08-03 2023-09-07 N
Meet requirements for sections of health care facilities separated by fire resistive construction. Fire Safety 2023-08-03 2023-09-07 N
Have an enclosure around a vertical opening shaft. Fire Safety 2023-08-03 2023-09-07 N
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. Fire Safety 2023-08-03 2023-09-07 N
Inspect, test, and maintain automatic sprinkler systems. Fire Safety 2023-08-03 2023-09-07 N
Have power receptacles that are properly grounded. Fire Safety 2023-08-03 2023-09-07 N
Have generator or other power source capable of supplying service within 10 seconds. Fire Safety 2023-08-03 2023-09-07 N
Have an enclosure around a vertical opening shaft. Fire Safety 2022-09-27 2022-12-05 N
Honor the resident's right to request, refuse, and/or discontinue treatment, to participate in or refuse to participate in experimental research, and to formulate an advance directive. Health 2022-09-14 2022-10-27 N
Meet other general requirements. Fire Safety 2022-09-27 2022-10-23 N
Meet requirements for sections of health care facilities separated by fire resistive construction. Fire Safety 2022-09-27 2022-10-23 N
Inspect, test, and maintain automatic sprinkler systems. Fire Safety 2022-09-27 2022-10-23 N
Ensure smoke barriers are constructed to a 1 hour fire resistance rating. Fire Safety 2022-09-27 2022-10-23 N
Meet requirements for the installation and maintenance of electrical systems. Fire Safety 2022-09-27 2022-10-23 N
Ensure proper usage of power strips and extension cords. Fire Safety 2022-09-27 2022-10-23 N
Provide properly protected cooking facilities. Fire Safety 2021-11-02 2021-12-01 N
Inspect, test, and maintain automatic sprinkler systems. Fire Safety 2021-11-02 2021-12-01 N
Install corridor and hallway doors that block smoke. Fire Safety 2021-11-02 2021-12-01 N
Ensure smoke barriers are constructed to a 1 hour fire resistance rating. Fire Safety 2021-11-02 2021-12-01 N