Deficiency Type of Deficiency Deficiency Date Date Corrected Resulted from a Complaint?
Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited. Health 2023-02-09 2023-04-01 N
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. Fire Safety 2022-03-23 2022-05-10 N
Install corridor and hallway doors that block smoke. Fire Safety 2022-03-23 2022-05-10 N
Install smoke barrier doors that can resist smoke for at least 20 minutes. Fire Safety 2022-03-23 2022-05-10 N
Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. Fire Safety 2022-03-23 2022-05-10 N
Have an externally vented heating system. Fire Safety 2022-03-23 2022-05-10 N
Provide appropriate treatment and care according to orders, resident?s preferences and goals. Health 2019-10-09 2019-11-10 N
Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited. Health 2019-10-09 2019-11-10 N
Have an alternate power supply for its alarm system. Fire Safety 2019-10-09 2019-11-10 N
Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. Fire Safety 2019-10-09 2019-11-10 N
Have an externally vented heating system. Fire Safety 2019-10-09 2019-11-10 N