A list of the most recent deficiencies for Pine Grove Healthcare Center. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.
Deficiency | Type of Deficiency | Deficiency Date | Date Corrected | Resulted from a Complaint? |
---|---|---|---|---|
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Fire Safety | 2023-07-05 | 2023-07-21 | N |
Inspect, test, and maintain automatic sprinkler systems. | Fire Safety | 2023-07-05 | 2023-07-21 | N |
Have properly installed electrical wiring and gas equipment. | Fire Safety | 2023-07-05 | 2023-07-21 | N |
Provide appropriate treatment and care according to orders, resident?s preferences and goals. | Health | 2022-02-11 | 2022-02-23 | Y |
Meet requirements for the installation and maintenance of electrical systems. | Fire Safety | 2021-08-17 | 2021-08-23 | N |
Employ sufficient staff with the appropriate competencies and skills sets to carry out the functions of the food and nutrition service, including a qualified dietician. | Health | 2019-02-13 | 2019-04-04 | N |
Establish policies and procedures for volunteers. | Fire Safety | 2019-02-11 | 2019-04-04 | N |
Have ramps, exits, fire escape ladders, steps, and areas of refuge that meet safety requirements. | Fire Safety | 2019-02-11 | 2019-04-04 | N |
Inspect, test, and maintain automatic sprinkler systems. | Fire Safety | 2019-02-11 | 2019-04-04 | N |
Install corridor and hallway doors that block smoke. | Fire Safety | 2019-02-11 | 2019-04-04 | N |
Meet requirements for the installation and maintenance of electrical systems. | Fire Safety | 2019-02-11 | 2019-04-04 | N |