Deficiency Records for Pebble Creek Healthcare Center

(Home page)

Updated as of April 01, 2024

A list of the most recent deficiencies for Pebble Creek Healthcare Center. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.

Deficiency Type of Deficiency Deficiency Date Date Corrected Resulted from a Complaint?
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. Fire Safety 2023-07-25 2023-09-02 N
Inspect, test, and maintain automatic sprinkler systems. Fire Safety 2023-07-25 2023-09-02 N
Ensure smoke barriers are constructed to a 1 hour fire resistance rating. Fire Safety 2023-07-25 2023-09-02 N
Ensure proper usage of power strips and extension cords. Fire Safety 2023-07-25 2023-09-02 N
Provide appropriate pressure ulcer care and prevent new ulcers from developing. Health 2022-05-31 2022-06-08 Y
Provide and implement an infection prevention and control program. Health 2021-11-29 2021-12-22 Y
Address subsistence needs for staff and patients. Fire Safety 2020-02-05 2020-02-18 N
Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. Fire Safety 2020-02-05 2020-02-18 N
Have generator or other power source capable of supplying service within 10 seconds. Fire Safety 2020-02-05 2020-02-18 N
Properly provide smoke detection systems in areas open to corridors. Fire Safety 2018-12-18 2019-01-30 N
Inspect, test, and maintain automatic sprinkler systems. Fire Safety 2018-12-18 2019-01-30 N
Install corridor and hallway doors that block smoke. Fire Safety 2018-12-18 2019-01-30 N
Ensure proper usage of power strips and extension cords. Fire Safety 2018-12-18 2019-01-30 N