A list of the most recent deficiencies for Kendal at Ithaca. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.
Deficiency | Type of Deficiency | Deficiency Date | Date Corrected | Resulted from a Complaint? |
---|---|---|---|---|
Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Health | 2023-05-05 | 2023-06-30 | N |
Provide and implement an infection prevention and control program. | Health | 2023-05-05 | 2023-06-30 | N |
Keep aisles, corridors, and exits free of obstruction in case of emergency. | Fire Safety | 2023-05-04 | 2023-06-30 | N |
Install proper backup exit lighting. | Fire Safety | 2023-05-04 | 2023-06-30 | N |
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Fire Safety | 2023-05-04 | 2023-06-30 | N |
Have generator or other power source capable of supplying service within 10 seconds. | Fire Safety | 2023-05-04 | 2023-06-30 | N |
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Fire Safety | 2021-05-11 | 2021-07-07 | N |
Install an approved automatic sprinkler system. | Fire Safety | 2019-03-08 | 2019-04-25 | N |
To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Fire Safety | 2019-03-08 | 2019-04-25 | N |
Have generator or other power source capable of supplying service within 10 seconds. | Fire Safety | 2019-03-08 | 2019-04-25 | N |
Ensure that testing and maintenance of electrical equipment is performed. | Fire Safety | 2019-03-08 | 2019-04-25 | N |