Deficiency Records for Bertrand Nursing Home

(Home page)

Updated as of March 01, 2024

A list of the most recent deficiencies for Bertrand Nursing Home. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.

Deficiency Type of Deficiency Deficiency Date Date Corrected Resulted from a Complaint?
Install an approved automatic sprinkler system. Fire Safety 2023-04-18 2023-05-31 N
Install corridor and hallway doors that block smoke. Fire Safety 2023-04-18 2023-05-31 N
Have simulated fire drills held at unexpected times. Fire Safety 2023-04-18 2023-05-31 N
Ensure that testing and maintenance of electrical equipment is performed. Fire Safety 2023-04-18 2023-05-31 N
Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. Health 2023-04-20 2023-05-12 N
Provide and implement an infection prevention and control program. Health 2021-12-02 2022-01-05 N
Have proper medical gas storage and administration areas. Fire Safety 2021-12-01 2022-01-03 N
Provide appropriate treatment and care according to orders, resident?s preferences and goals. Health 2021-12-02 2021-12-31 N
Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. Health 2021-12-02 2021-12-31 N
Set up an ongoing quality assessment and assurance group to review quality deficiencies and develop corrective plans of action. Health 2021-12-02 2021-12-31 N
Inspect, test, and maintain automatic sprinkler systems. Fire Safety 2021-12-01 2021-12-31 N
Provide appropriate pressure ulcer care and prevent new ulcers from developing. Health 2021-12-02 2021-12-29 N
Meet other general requirements that are deficient. Fire Safety 2021-12-01 2021-12-22 N
Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. Health 2021-12-02 2021-12-06 N
Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted Health 2019-12-17 2020-01-23 N
Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. Health 2019-12-17 2020-01-23 N
Implement emergency and standby power systems. Fire Safety 2019-12-11 2020-01-23 N
Have simulated fire drills held at unexpected times. Fire Safety 2019-12-11 2020-01-23 N
Have generator or other power source capable of supplying service within 10 seconds. Fire Safety 2019-12-11 2020-01-23 N