CONTACT INFORMATION REVIEWS & MORE DATA
Deficiency Records for Westview Acres Care Center
View the most recent health deficiencies and inspection results for Westview Acres Care Center. Stay informed about quality of care issues.
View the most recent health deficiencies and inspection results for Westview Acres Care Center. Stay informed about quality of care issues.
| Deficiency | Type of Deficiency | Deficiency Date | Date Corrected | Resulted from a Complaint? |
|---|---|---|---|---|
| Assess the resident when there is a significant change in condition | Health | 2025-06-05 | 2025-06-23 | N |
| Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Fire Safety | 2025-06-05 | 2025-06-18 | N |
| Ensure that testing and maintenance of electrical equipment is performed. | Fire Safety | 2025-06-05 | 2025-06-18 | N |
| Have proper medical gas storage and administration areas. | Fire Safety | 2025-06-05 | 2025-06-18 | N |
| Provide properly protected cooking facilities. | Fire Safety | 2025-06-05 | 2025-06-03 | N |
| Provide enough nursing staff every day to meet the needs of every resident; and have a licensed nurse in charge on each shift. | Health | 2024-07-25 | 2024-08-16 | N |
| Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | Health | 2024-07-25 | 2024-08-16 | N |
| Develop and implement policies and procedures to prevent abuse, neglect, and theft. | Health | 2024-07-25 | 2024-08-16 | N |
| Honor the resident's right to request, refuse, and/or discontinue treatment, to participate in or refuse to participate in experimental research, and to formulate an advance directive. | Health | 2024-07-25 | 2024-08-16 | N |
| Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited. | Health | 2024-07-25 | 2024-08-16 | N |
| Provide and implement an infection prevention and control program. | Health | 2024-07-25 | 2024-08-16 | N |
| Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Fire Safety | 2024-07-25 | 2024-08-02 | N |
| Have properly installed electrical wiring and gas equipment. | Fire Safety | 2024-07-25 | 2024-08-02 | N |
| Inspect, test, and maintain automatic sprinkler systems. | Fire Safety | 2024-07-25 | 2024-08-02 | N |
| Use approved construction type or materials. | Fire Safety | 2024-07-25 | 2024-08-02 | N |
| Provide and implement an infection prevention and control program. | Health | 2024-02-29 | 2024-03-22 | Y |
| Inspect, test, and maintain automatic sprinkler systems. | Fire Safety | 2023-05-24 | 2023-07-31 | N |
| Notify the resident or the resident?s representative in writing how long the nursing home will hold the resident?s bed in cases of transfer to a hospital or therapeutic leave. | Health | 2023-05-24 | 2023-06-16 | N |
| Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Health | 2023-05-24 | 2023-06-16 | N |
| Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Health | 2023-05-24 | 2023-06-16 | N |
| Give their staff education on dementia care, and what abuse, neglect, and exploitation are; and how to report abuse, neglect, and exploitation. | Health | 2023-05-24 | 2023-06-16 | N |
| Install proper backup exit lighting. | Fire Safety | 2023-05-24 | 2023-06-08 | N |
| Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Fire Safety | 2023-05-24 | 2023-06-07 | N |
| Have properly installed electrical wiring and gas equipment. | Fire Safety | 2023-05-24 | 2023-06-07 | N |
| Install an approved automatic sprinkler system. | Fire Safety | 2023-05-24 | 2023-06-07 | N |
| Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Fire Safety | 2023-05-24 | 2023-06-07 | N |
| Have properly located and lighted "Exit" signs. | Fire Safety | 2023-05-24 | 2023-06-06 | N |
| Install emergency lighting that can last at least 1 1/2 hours. | Fire Safety | 2023-05-24 | 2023-05-26 | N |