Deficiency Records for Good Shepherd Home-Bethlehem

(Home page)

Updated as of April 01, 2024

A list of the most recent deficiencies for Good Shepherd Home-Bethlehem. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.

Deficiency Type of Deficiency Deficiency Date Date Corrected Resulted from a Complaint?
Have stairways and smokeproof enclosures used as exits that meet safety requirements. Fire Safety 2023-12-21 2024-02-19 N
Install corridor and hallway doors that block smoke. Fire Safety 2023-12-21 2024-02-19 N
Ensure proper usage of power strips and extension cords. Fire Safety 2023-12-21 2024-02-19 N
Use approved construction type or materials. Fire Safety 2023-01-25 2023-03-23 N
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. Fire Safety 2023-01-25 2023-03-23 N
Install smoke barrier doors that can resist smoke for at least 20 minutes. Fire Safety 2023-01-25 2023-03-23 N
Keep aisles, corridors, and exits free of obstruction in case of emergency. Fire Safety 2022-02-16 2022-04-01 N
Inspect, test, and maintain automatic sprinkler systems. Fire Safety 2022-02-16 2022-04-01 N
Ensure proper usage of power strips and extension cords. Fire Safety 2022-02-16 2022-04-01 N