Deficiency | Type of Deficiency | Deficiency Date | Date Corrected | Resulted from a Complaint? |
---|---|---|---|---|
Provide and implement an infection prevention and control program. | Health | 2018-09-20 | 2018-11-06 | Y |
Respond appropriately to all alleged violations. | Health | 2018-03-30 | 2018-05-08 | N |
Provide appropriate treatment and care according to orders, resident?s preferences and goals. | Health | 2018-03-30 | 2018-05-08 | N |
Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Fire Safety | 2018-03-29 | 2018-04-26 | N |
Install properly constructed and protected linen or trash chutes. | Fire Safety | 2018-03-29 | 2018-04-26 | N |
Have a correctly designed non-healthcare occupancy area in a health care facility. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Use approved construction type or materials. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Have properly located and lighted "Exit" signs. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Have approved installation, maintenance and testing program for fire alarm systems. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Inspect, test, and maintain automatic sprinkler systems. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Install corridor and hallway doors that block smoke. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Fire Safety | 2017-02-21 | 2017-04-22 | N |
Provide necessary care and services to maintain or improve the highest well being of each resident . | Health | 2017-02-15 | 2017-03-24 | N |
Approved construction type or materials. | Fire Safety | 2016-04-05 | 2016-06-01 | N |
Walls that prevent smoke from passing through and would resist fire for at least one hour. | Fire Safety | 2016-04-05 | 2016-06-01 | N |
Protected exits that allow the resident to escape the building. | Fire Safety | 2016-04-05 | 2016-06-01 | N |
Exits that are accessible at all times. | Fire Safety | 2016-04-05 | 2016-06-01 | N |
An approved automatic sprinkler system connected to the fire alarm system. | Fire Safety | 2016-04-05 | 2016-06-01 | N |
Automatic sprinkler systems that have been maintained in working order. | Fire Safety | 2016-04-05 | 2016-06-01 | N |
A separate and independent backup electrical power source. | Fire Safety | 2016-04-05 | 2016-06-01 | N |
Reasonably accommodate the needs and preferences of each resident. | Health | 2016-04-01 | 2016-05-31 | N |
Provide necessary care and services to maintain or improve the highest well being of each resident . | Health | 2016-04-01 | 2016-05-31 | N |
Ensure that a nursing home area is free from accident hazards and provide adequate supervision to prevent avoidable accidents. | Health | 2016-04-01 | 2016-05-31 | N |