A list of the most recent deficiencies for The Mennonite Home. The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.

Deficiency Type of Deficiency Deficiency Date Date Corrected Resulted from a Complaint?
Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. Fire Safety 2023-11-14 2023-12-01 N
Install properly constructed and protected linen or trash chutes. Fire Safety 2023-11-14 2023-12-01 N
Ensure proper usage of power strips and extension cords. Fire Safety 2023-11-14 2023-12-01 N
Have stairways and smokeproof enclosures used as exits that meet safety requirements. Fire Safety 2023-01-31 2023-02-10 N
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. Fire Safety 2023-01-31 2023-02-10 N
Install corridor and hallway doors that block smoke. Fire Safety 2023-01-31 2023-02-10 N
Ensure smoke barriers are constructed to a 1 hour fire resistance rating. Fire Safety 2023-01-31 2023-02-10 N
Install a two-hour-resistant firewall separation. Fire Safety 2021-12-14 2022-01-28 N
Have stairways and smokeproof enclosures used as exits that meet safety requirements. Fire Safety 2021-12-14 2022-01-28 N
Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. Fire Safety 2021-12-14 2022-01-28 N
Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. Fire Safety 2021-12-14 2022-01-28 N
Install corridor and hallway doors that block smoke. Fire Safety 2021-12-14 2022-01-28 N
Ensure smoke barriers are constructed to a 1 hour fire resistance rating. Fire Safety 2021-12-14 2022-01-28 N
Install smoke barrier doors that can resist smoke for at least 20 minutes. Fire Safety 2021-12-14 2022-01-28 N