Most Recent Deficiencies for INN AT SARASOTA BAY CLUB

Updated as of March 01, 2020

The list is based on the information provided by CMS from both standard inspections and from complaints filed by residents.

The tables below are too small to fit on a phone. More information can be seen using a larger device such as a tablet, laptop, or desktop computer.

Deficiency Deficiency Date
Keep aisles, corridors, and exits free of obstruction in case of emergency. 2019-12-09
Install emergency lighting that can last at least 1 1/2 hours. 2019-12-09
Be properly staffed 2019-12-09
Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. 2018-11-14
Have approved installation, maintenance and testing program for fire alarm systems. 2018-11-14
Provide properly protected cooking facilities. 2017-10-03
Install an approved automatic sprinkler system. 2017-10-03
Have generator or other power source capable of supplying service within 10 seconds. 2017-10-03
Honor the resident's right to request, refuse, and/or discontinue treatment, to participate in or refuse to participate in experimental research, and to formulate an advance directive. 2019-12-12
Provide and implement an infection prevention and control program. 2019-12-12
Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted 2018-11-15
Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. 2018-11-15
Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install 2018-11-15
Ensure a licensed pharmacist perform a monthly drug regimen review, including the medical chart, following irregularity reporting guidelines in developed policies and procedures. 2018-11-15
Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is ne 2018-11-15
Provide and implement an infection prevention and control program. 2018-11-15
Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame. 2018-11-15